| Book
your pool opening online
Elite
Pool Opening & Startup
Your
Elite pool opening will be done over a two-day period
and in most cases will be complete in this time frame.
However, due to circumstances beyond our control it
sometimes takes a little longer (i.e. poor weather,
equipment repairs, dirty/green pools, etc.).
The following tasks are completed for a elite pool opening
& startup;
Day
1 (pool opening);
- Pump off cover, empty
waterbags, remove leaves
- Remove and clean cover,
waterbags
- Fold cover & waterbags,
put away
- Take large leaves, debris
out of pool
- Clean waterline &
in-wall stairs, inside skimmer
- Clean ladder, diving
board, slide
- Clean deck area where
cover sat
- Remove plugs from returns,
skimmer
- Install eyeballs, backwash
hose
- Install ladder(s), handrail(s),
diving board, slide and pool light(s)
- Install plugs, lids,
gaskets on filtration system
- Attach solar blanket
to roller, bubbles down (check condition)
- Skim pool surface
- Clean up leaves and
garbage
- Take water sample
Day
2 (startup)
- Check all plugs, gauges,
clamps on filter system
- Make sure liner is in
track
- Assemble automatic pool
cleaner, if available >
- Prime pump & start
up pool
- Light vacuum of pool
- Clean water line &
in-wall stairs, inside skimmer
- Skim pool surface
- Brush down pool floor
& walls
- Fill chlorinator/brominator
or put pucks in skimmer
- Add chemicals as per
water analysis printout
Standard
Pool Opening**
Your
standard pool opening will be done in one day.
If equipment is not in working order on the day of the
pool opening, a service call would have to be booked
through our service department. The following
tasks are completed for a standard pool opening:
- Pump off cover, empty
waterbags, remove leaves
- Remove and clean cover,
waterbags
- Fold cover & waterbags,
put away
- Take large leaves, debris
out of pool (maximum of 2 garbage bags)*
- Clean waterline &
in-wall stairs, inside skimmer
- Clean ladder, diving
board, slide
- Clean deck area where
cover sat
- Remove plugs from returns,
skimmer
- Install eyeballs, backwash
hose
- Install ladder(s), handrail(s),
diving board, slide and pool light(s) >
- Install plugs, lids,
gaskets on filtration system >
- Attach solar blanket
to roller, bubbles down (check condition)
- Skim pool surface
- Clean up leaves and
garbage (home owner to dispose of)
*Excessive
amounts of leaves and debris will result in additional
clean up charges.
**This
pool opening must be prepaid at the time of booking.
Book
your pool opening online
|